桩基浇筑工程台账
山东桥梁施工队东分块3#高架桥墩灌注工程施工台账(k11+665-k18+717) 序号 1 2 3 4 5 6 7 8 9 10 11 12 13 桩号 416#-4#墩 416#-3#墩 416#-1#墩 417#-1#墩 433#-1#墩 417#-2#墩 419#-4#墩 423#-1#墩 432#-1#墩 419#-3#墩 421#-4#墩 418#-1#墩 434#-1#墩 桩顶标高 桩底标高 护筒长度 护筒标高 实际深度 设计深度 (m) (m) (m) (m) (m) (m) 22.853 22.853 22.853 22.668 22.707 22.668 22.668 22.707 22.668 22.449 22.668 22.630 23.162 -32.147 -32.147 -32.147 -32.332 -32.293 -32.332 -32.332 -32.293 -32.332 -32.551 -32.332 -32.370 -31.838 3 3 3 3 2 3 3 2 2 3 3 3 2 23.673 23.863 23.970 23.989 23.540 23.217 23.075 23.639 23.733 23.268 23.700 23.597 23.708 55.820 56.010 56.117 56.065 56.334 56.032 55.967 55.546 55.649 56.221 55.842 56.077 55.803 55.00 55.00 55.00 55.00 55.00 55.00 55.00 55.00 55.00 55.00 55.00 55.00 55.00 灌注时间 2013.7.11 14:20-22:10 2013.07.17 9:28-15:16 2013.07.20 10:54-17:11 2013.8.13 8:30-3:30 2013.08.15 21:03-1:49 2013.08.16 2:18-7:20 2013.8.23 19:30-23:00 2013.08.19 9:50-15:10 2013.08.20 18:58-22:45 2013.08.21 14:49-18:18 2013.08.22 22:39-1:28 2013.08.25 16:35-20:30 2013.08.25 12:28-15:36 设计砼量 实际砼量 成孔方式 桩检类别 3 3 (m ) (m ) 97.3 97.3 97.3 97.3 97.3 97.3 97.3 97.3 97.3 97.3 97.3 97.3 97.3 112 107 116 113 99 104 107 106 108 108 104 102 106.5 旋挖钻 旋挖钻 旋挖钻 旋挖钻 反循环 旋挖钻 旋挖钻 反循环 反循环 旋挖钻 旋挖钻 旋挖钻 反循环 Ⅰ Ⅰ Ⅰ Ⅰ Ⅰ 有球未出来 有球未出来 Ⅰ Ⅰ 备注